The Nebraska Department of Transportation (NDOT) will soon be conducting survey work in preparation for a proposed future project on the U.S. Highway 275 corridor near Wisner.

The project would expand approximately 15.5 miles of the existing two-lane highway on US-275 to a four-lane expressway by constructing a new, parallel two-lane roadway on one side of the existing US-275.

To read the full story, please log-in or subscribe to the digital edition:

Click here for West Point News E-Edition